Projects

Featured program

Blair County, PA

~48 MWdc~36 MWacTwo adjoining utility-scale sites

Two utility-scale PV facilities — 20.4 MWdc and 27.7 MWdc — delivered as one coordinated program across ridge-and-hollow terrain.

  • ~70,000 modules and 13,000+ driven piles on single-axis trackers, tracked pile by pile in Construction View
  • Nearly 500 ft of elevation change, with bedrock as shallow as 2 ft
  • On-site 34.5/46 kV substation
  • Dual-circuit 23 kV / 46 kV gen-tie: 1.3 miles overhead on poles up to 125 ft, alongside an existing 115 kV line, plus an underground road crossing
  • Load-rated 20-ft precast bridge for a stream crossing and ~4 miles of new access roads
  • Wetland and stream permitting across both sites

Representative experience

Recent and active projects

Utility-scale solar

Morrisdale, PA

28.3 MWdc

  • Two array sites, east and west
  • 48,216 bifacial modules on 689 terrain-following trackers
  • A shale shelf stopped ~70% of west-site piles — foundations moved to down-the-hole pre-drilling
  • Built alongside cold-water-fishery streams

Utility-scale solar

Woodland, PA

28.2 MWdc

  • 45,696 modules on 614 trackers and 7,756 posts across a 94.5-acre array
  • Foundations moved to 100% pre-drilling
  • Subsurface voids located and grouted during foundation work
  • Taller terrain posts to hold row alignment over uneven ground

Utility-scale solar

Burgettstown, PA

~26 MWdc

  • Built on reclaimed mine land
  • All-terrain trackers that follow the ground, with 674 slew drives
  • Rows following steep hillside grades
  • Delineated wetlands on site

Utility-scale solar

Bigler Township, PA

~27 MWdc20 MWac

  • Built on former surface-mine land
  • About 130 acres of clearing
  • Steep-slope stabilization
  • 650 W bifacial modules on single-axis trackers

Municipal solar

Punxsutawney, PA

4.2 MWdc3.0 MWac

  • On borough land, straddling the borough–township line
  • Active gas wells and a gas line on site, next to the Elk Run floodway
  • Riprap diversion channels, infiltration berm and trench for stormwater
  • 34.5 kV tie-in after a three-phase line upgrade

Distributed generation portfolio

Clearfield County, PA

~25.7 MWdc18 MWac

  • Six 3 MWac net-metered projects
  • Single-axis trackers with bifacial modules
  • Two sites laid out around active natural-gas wells
  • Tie-ins on 12.47 kV and 34.5 kV distribution circuits

From the field

Our crews, our equipment, our sites

Bring us
in early.

The sooner we see the site, design and interconnection plan, the more cost, schedule and risk we take out.

info@terraprimepower.com Our Services | →